plastic tools
"plastic tools" is listed under
MouldCategory
Delivery of first article samples, 4 weeks (very simple parts) – 12 weeks (normal complexity) – longer for complex or parts requiring ceramic core toolingDelivery of production, 2 – 12 weeks after First Article approval.Highest tooling expenseLowest investment casting pattern costHard tooling will have the longest life. Simple tooling will last for hundreds of thousands of parts. Complex tooling with slides and cores will wear over time but can generally be refurbished. This is not normally necessary for many years.Yields the best surface finish and most consistent dimensional control. Hard tooling service:We can tailor various kinds of Moulds for each customer as per their requirements. The follow detail information for your reference: Plastic Material Thermoplastics,such as ABS, PC,POM,PVC,PP,PA66,TPU Thermosets,such as PF,MF,DAP Cavity Single/Multi Runner Hot/Cold Design software UG, PROE, Solidworks, Moldflow etc. Plastic material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc. Mould life 20,000-2,000,000 shots Delivery time 20-60days Packaging Package with plywood and spray rust prevent oild Specification Depends on customers requirements The process from product to delivery (Customer Service Guidance):1, Customers offer 3D drawings and related information of the moulds and plastics.2, We quote the mould & unit price of plastics accordingly.3, Customers review the quotation.4, Customers place order to us.5, Engineering design, include mould design, moldflow anal`ysis, prototype assembly.6. Send mould design for customer approval, update the design according customer’s feedback.7. Build the mould.8. Send T1 sample to customers to get approval and to see if there would be any slightly modification before mass production.9. Arrange mass production within the leading time.10. Deliver the merchandize by sea or by air on time as per the request of customers.
View All Products posted by
Smart Tech E Limited