Welcome Guest | |
Live Chat
Call Back
Submit Your Sourcing Requirement
Advanced Search Filtersdown arrow
Print

Xuzhou Hercules Machine Manufacture Co., Ltd.

Company Summary:

  • Since 2008
  • 101-150 Employees
  • Turnover 100,000.00 USD per year
  • 30% turn over from existing products
  • 4 year(s) of Export Experience
  • Limited Company

Additional Contacts:

http://www.xzhgls.com
Export Department
Alina zhou
Phone: 86 - 0516 - 86263792/86 - 15715226259
Fax: 86 -

Company Address:

Haihe road ,Pizhou Ecomic Development Zone Jiangsu Province
xuzhou, jiangsu
China, 221300
Web Page Link: http://www.toboc.com/xuzhouherculesmachinemanufacturecoltd

GET A QUOTE

Details of Product or Sell Offer
product

Vibration Gravel Pile Driver

"Vibration Gravel Pile Driver" is listed under  Construction EquipmentCategory

Vibration Gravel Pile Driver is the popular machine used for the foundation construction of high-rise building. The hydraulic rotation of this kind of vibration Pipe Gravel Pile is flexible and could rotate 360& 176. The machinery could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, it is the best investment to improve your business productivity.Operation Process:1, Move the pile machine and body frame, make the pile tip align with pile location. 2, Drive the Vibratory Hammer, drop the pile to the established depth.3, Fill in the required volume gravel to the pile machine.4, Pump the air into the pile machine by air compressor. 5, Lift the machine1—2m, the gravel will drop to the drilling hole by the air pressure and gravity.6, Drop the pile machine to ensure the gravel compact. 7, Repeat above (4)?(5)?(6) process.8, When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above (4)?(5)?(6) process.9, When the pile machine lifted to the designed height of the pile top, all the process complete.By this means, the construction speed is 1.5-2.6 times than routine meth`ods



Product Detail

NA
100     USD Per Sets
1     Sets
1   month(s)
100   Sets Yearly
sinking pipe piles, piling machine, Pile Driver
#sinkingpipepiles, #pilingmachine, #PileDriver

View All Products posted by Xuzhou Hercules Machine Manufacture Co., Ltd.


You may be interested in.
Zhejiang Zhongyang Screw Manufacturing Co.,Ltd.
>