Welcome Guest | |
Live Chat
Call Back
Submit Your Sourcing Requirement
Advanced Search Filtersdown arrow
Print

Cccc Fwk International Formwork Corporation

Company Summary:

  • Since 2013
  • 76-100 Employees
  • Turnover 10,000,000.00 USD per year
  • 90 year(s) of Export Experience
  • Limited Company

Additional Contacts:

www.fwkform.com
Export Department
Mark Hu
Phone: +86 - 0317 - 4710188/+86 - 15031775463
Fax: +86 - 0317 - 4710188

Company Address:

east economic development zone,Cangzhou city, China
cangzhou, Hebei
China, 061000
Web Page Link: http://www.toboc.com/ccccfwkinternationalformworkcorporation765057

GET A QUOTE

Details of Product or Sell Offer
product

Table Formwork with Ring-Lock Scaffolding for Slab Formwork System

"Table Formwork with Ring-Lock Scaffolding for Slab Formwork System" is listed under  Building FacilitiesCategory

Detailed Product Descriptionsuspended slab formworkslab form workconcrete slab formworkWaterproof Slab Formwork System With Ring-Lock Scaffolding Table FormworkDescription:Brief introductionFA-TNOR system is widely used for pouring slab concrete, especially for the building which has higher story height that only using props can’t meet requirements. The system guarantees quick assembly, simple structure and easily operation, it is good choice for slab construction.About the infill areasLike RA-INST system, infill materials are necessary for small space or same special area. They are usually composed of timber beam, head-jack, scaffold support, and plywood as the below picture shown. Competitive advantage? Fast constructionThe table formwork is pre-assembled all the structural elements are connected by specific fastenings, so it is easily to move and turnover.?Easy operationThe formwork is composed of plywood, timber beam, channel beam, connectors and ring-lock scaffolding support system. It’s easy to assemble for labors with simple structure. Special skill train is no needed.?Height of scaffolding is adjustableTable formwork is supported with adjustable scaffoldings the scaffoldings can be pivoted in two directions for meeting the demand of different height with adjustable head jack and adjustable foot jack.?Mature system with specific tools for removing.We afford trolley for FA-TNOR system, trolley is especially for shifting table formwork from the slab, it guarantees easy operation and safe removing.



Product Detail

NA
1000     USD Per Pieces
1     20' Container
15   day(s)
100   Pieces Daily
table formwrok, slab formwork, formwork
#tableformwrok, #slabformwork, #formwork

View All Products posted by CCCC FWK INTERNATIONAL FORMWORK CORPORATION


You may be interested in.
Hong Kong You Peng International Trade
>