Welcome Guest | |
Live Chat
Call Back
Submit Your Sourcing Requirement
Advanced Search Filtersdown arrow
Print

Cccc Fwk International Formwork Corporation

Company Summary:

  • Since 2013
  • 76-100 Employees
  • Turnover 10,000,000.00 USD per year
  • 90 year(s) of Export Experience
  • Limited Company

Additional Contacts:

www.fwkform.com
Export Department
Mark Hu
Phone: +86 - 0317 - 4710188/+86 - 15031775463
Fax: +86 - 0317 - 4710188

Company Address:

east economic development zone,Cangzhou city, China
cangzhou, Hebei
China, 061000
Web Page Link: http://www.toboc.com/ccccfwkinternationalformworkcorporation765057

GET A QUOTE

Details of Product or Sell Offer
product

Concrete Climbing Building Formwork with Adjustable Truss CB240B

"Concrete Climbing Building Formwork with Adjustable Truss CB240B" is listed under  Building FacilitiesCategory

Detailed Product DescriptionRecyclingTimber beam FormworkWaterproof FormworkConcrete Climbing Building Formwork with Adjustable Truss CB240BCB240 climbing system is mainly used for concrete pouring in the wall, the core wall, the pier, etc. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations. Competitive Advantage: 1. High bearing capacityThe high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.2.Simple moving procedure by craneThrough the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.3. Fast striking process without a craneWith the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.4. Safe with work platformThe platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location. 5. Easy operation with truss supporting.The formwork was supporting by truss unit that makes formwork operation easier by means of the platform form truss and same like adjustable brace, the truss also guarantees formwork’s exact verticality.



Product Detail

NA
1000     USD Per Pieces
1     20' Container
15   day(s)
100   Pieces Daily
climbing formwork, formwork, timber beam formwork
#climbingformwork, #formwork, #timberbeamformwork

View All Products posted by CCCC FWK INTERNATIONAL FORMWORK CORPORATION


You may be interested in.
Hong Kong You Peng International Trade
>